The Building Safety Levy (BSL) doesn’t kick in until October, so its effect on the market so far has been limited. But developers working on schemes that will fall within its scope are already starting to think ahead, and the decisions they’re making now, about phasing, resourcing and who’ll handle their building control approval, are already being shaped by what’s coming.
For your local authority, the way you plan to administer your BSL obligations is likely to become a factor in whether developers see you as a viable option once the levy is live, particularly on larger sites where the numbers involved are substantial.
If you get your process right, you’ll be well placed to stay in contention for schemes that might otherwise go elsewhere. However, get it wrong, and you risk losing visibility of a development until it’s finished. That can have knock-on effects for your local housing supply, because friction anywhere in the process slows delivery down.
This blog looks at how that shift is likely to play out, and what it means for the choices your local authority can make now to stay competitive once the BSL lands.
The choice behind every BSL-eligible development
Once the levy applies from October, your local authority will need to decide how it’s calculated and paid on each eligible development. You can charge it by plot, by phase or across a whole site. Each approach produces a different administrative and financial picture for the developer, and each one places a different demand on your team.
Charging by site treats the development as one unit, with GIA calculated and the levy charged against the whole scheme in a single figure. It’s the most straightforward option to administer, because there’s only one calculation and one payment to track. Charging by phase breaks that down into stages, usually aligned with how the site is being built out, which spreads the liability but still ties it to milestones the developer may not fully control.
Charging by plot goes further still, calculating and charging the levy against individual units as they’re completed or sold.
The option you choose will determine how much flexibility the developer gets in managing their exposure to the levy. It will also determine how much work your team takes on to administer it. Plot-level charging means more individual GIA calculations, more payment records and more figures to reconcile at the end of each quarter, all of which will need to feed into a single, coherent return to MHCLG. Without the right system behind it, that additional workload can be enough to put local authorities off offering that option at all, even if it’s what developers would prefer. That’s understandable, but it also means the authorities without the right system will rule themselves out of the more complex, higher-value schemes before the conversation with a developer has even started.
How your charging structure affects the process
Site-wide or phase-level charging concentrates cost. A developer working on a large or multi-phase scheme can face a substantial levy liability tied to milestones that don’t necessarily match when their units are selling or when the cash is coming in. That mismatch creates pressure, and pressure on cash flow can have a big impact on how quickly a developer is willing to commit resources to a site, or how many sites they can run at once.
Plot-level charging removes much of that pressure. It means BSL payments can align more closely with delivery, so the levy becomes a cost per unit, rather than a lump sum tied to a phase or milestone. For developers managing multiple sites and multiple obligations at once, that difference in structure can influence which schemes they prioritise and which they delay.
This is where the BSL connects directly to your local housing supply. Developers don’t tend to build at a fixed rate, regardless of conditions. They allocate resources to the properties sold and that are easiest to progress and a BSL process that ties up their cash ahead of their income makes a scheme harder to progress, whatever its underlying viability.
Offering granular, plot-level charging removes one of the obstacles that can otherwise slow a scheme down, which supports delivery rather than working against it.
Local authority or RBCA?
For BSL-eligible schemes, the choice developers make won’t just be about the levy. It will also be about who carries out building control approval on the project, either your local authority or a Registered Building Control Approver (RBCA).
In some instances RBCAs be the default for larger and more complex sites, a preference that predates the levy. Developers working on schemes with tight programmes and significant financial exposure tend to gravitate towards RBCAs because they can often offer a level of flexibility and dedicated resourcing that some local authorities have struggled to match. Once BSL administration is added to an already stretched workload, that gap is likely to widen.
Where local authorities have lost larger schemes to RBCAs, it hasn’t generally been down to a shortfall in technical capability, but because the process on offer looked less workable than the alternative on the table.
A team already managing a full caseload alongside inspections, consultations and reporting duties often has less capacity to offer the kind of flexible administration that wins over a developer running a larger scheme. RBCAs, by comparison, are often able to present a simpler, more predictable proposition, even where the underlying regulatory requirements are the same.
That matters, because your team will have no visibility of any scheme that goes to an RBCA until they receive the initial notice and the revenue and oversight that come with being the building control body will sit elsewhere.
It also means the data that would otherwise feed into your understanding of building activity in your area, which is useful for planning, resourcing and reporting purposes, won’t be there.
What brings developers back to the local authority route
Developers tend to choose the option with less friction and more predictability. So, if your local authority can demonstrate a genuinely workable BSL process, particularly one that offers granular, plot-level flexibility, you’ll become a credible option again, including for the larger sites that have been going elsewhere.
What developers are looking for is straightforward.
They want clarity on how and when they’ll be charged.
They want confidence that the figures will be accurate, so there’s less risk of disputes further down the line. And they want a process that doesn’t force them to absorb cost faster than their build programme generates income.
If your local authority can offer all three, you stand a real chance of bringing larger schemes back onto your books and being seen as a viable alternative to an RBCA, rather than a fallback for smaller sites only.
How Resolution DM’s software delivers that flexibility
Our BSL module allows your team to drill down to plot level, not just phase or site level, within a building control application. That means your team can calculate and charge the BSL against individual units within a scheme, giving developers the same flexibility they’d expect from an RBCA, without your authority losing oversight of the process.
GIA verification, fee calculation and payment tracking all run through the same system, whether you’re charging by plot, phase or site. It means your team isn’t working from separate spreadsheets for each approach, and developers aren’t left chasing updates across different points of contact. Every measurement, calculation and payment status is recorded and auditable, which matters when MHCLG asks questions or when a developer wants to see exactly how a figure was reached.
This information all sits within the BSL levy module or the same connected system that manages your wider building control process. It’s part of the same workflow your team already knows, viewed through the same portal your applicants already use. Developers can see the status of their BSL charges, payments and certification alongside the rest of their application.
No other provider currently combines a client-facing portal with fully integrated back-office tools in this way, which means you can give developers real-time visibility of where things stand whille your authority keeps full control of the process.
For a developer weighing up your building control offer against an RBCA, that combination of flexibility and transparency is exactly the kind of thing that can shift their choice in your favour.
If you’d like to see how this works and what a solution might look like for your building control team, get in touch to arrange a demonstration.